Project: N524JL/N87JL   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Jeremy Leonard   -  
Project:   Vans - RV-7A   -   VIEW REPORTS
Total Hours:1074
Total Flight Time:
Start/Last Date:Mar 17, 2021 - No Finish Date
Engine:Lycoming IO360M1B
Propeller:Sensenich 3 Blade Composite Ground Adjustable/Fixed pitch
Panel:Garmin G3XTOUCH/GNX375/G5/GTR200/GFC507
 
Friendly URL: https://eaabuilderslog.org?s=N524JL/N87JL

Home or Last Project Picture

Jul 02, 2022     Spar doublers F&E/Final drill fork - (4 hours)       Category: Wings
Spent the first part of this beautiful Americas birthday weekend clamping, match drilling the center and tip spar doublers, as well as deburring the holes. I also traced the the aileron push rod hole that had to be cut out. Not sure why this part isn't match holed and precut, but I assume it's part of what goes into the 51%. Either way, it was pretty simple and fun to really fabricate a piece. Between a step drill and the little sanding wheels chucked up in the dremel, it was a fairly quick job.

Due to the scuffing that happened when cutting out that hole, I decided to just scuff up the whole doubler and the corresponding section on the spar for priming. Pretty much at the same time I clecoed the fork and doubler to final reem them to #30. I also final reemed the skin attach holes to #40 since you won't be able to get to them once the fork is installed. They will get dimpled as well, next….


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.